Description
Reporting to the Foreman, the Pipe Layer is responsible for preparing and installing underground pipelines in preparation for road construction.
Key Responsibilities:
- Install sanitary and storm water sewer structures and pipe systems
- Lay out pipe routes, following specifications or blueprints, and coordinating layouts with supervisor
- Cut pipes to required lengths
- Assist in aligning pipes during pipeline construction
- Align and position pipes to prepare them for welding or sealing
- Check slopes for conformance to requirements, using levels or lasers
- Connect pipe pieces and seal joints, using cement, or glue
- Tap and drill holes into pipes to introduce auxiliary lines or devices
- Cover pipes with earth or other materials
- Grade and level trench bases, using tamping machines and hand tools
- Train others in pipe-laying techniques
Required Qualifications and Skills :
- 2 to 5 years’ experience in Heavy Civil Construction; Road, Water-Sewer, site grading, etc.
- Problem solving skills and ability to give direction to workers
- Ability to physically demonstrate & lead by example
- Valid G Drivers License
- Excellent writing, oral communication skills.